NHSA H6/H7 Hoboken Phase 3 Construction and Traffic Management Activities: July 21st – July 25th, 2025
Project Overview
The goal of the project is to reduce combined sewer overflows (CSO’s) and improve the water quality of the Hudson River. As part of the project, new storm sewer lines and curb inlets will be installed which will alleviate drainage and potential flooding issues in the northern H6 and H7 drainage basins in Hoboken.
Key Phases & Timeline
Monday, July 21 to Friday, July 25, 2025,
Construction Activities:
Jefferson Street
Sidewalk and Curb restoration on Jefferson at 14th
Madison Street between 13th and 14th
Sidewalk and Curb restoration
Adams Street between 15th Street and 16th Street
Installation of catch basin inlets and associated piping
Grand Street between 15th Street and 16th Street
Installation of piles and pile caps
Installation of 18" Storm pipe
Installation of manholes
Grand Street between 13th Street and 14th Street
Installation of piles, pile caps, and pipe cradles
Installation of 36" Storm pipe
Installation of manholes
15th Street between Adams Street and Grand Street
Installation of piles, pile caps, concrete cradles
Installation of 24" Storm pipe
Installation of manholes
13th Street between Adams Street and Grand Street
Installation of piles, pile caps, and concrete cradles
Installation of 48" Storm pipe
Traffic Management:
15th Street between Adams Street and Grand Street
No parking (24 hours, 7 days/week) signs will be placed on both sides
Roadway open to all traffic
Academy Bus Services can access work area to enter/exit their parking lots.
13th Street between Jefferson and Madison
No parking (24 hours, 7 days/week) signs will be placed on both sides of the Street.
Jefferson Street between 13th Street and 14th Street
No parking (24 hours, 7 days/week) both sides of the street
Madison and Jefferson Street between 14th and 15th Street
No parking (24 hours, 7 days/week) both sides of the streets
Academy Bus Service re-configured entrance/exit routing
Grand Street between 15th and 16th Street
No parking (24 hours, 7 days/week) on both sides of the street.
Road to be closed 24 hours, 7 days/week
Road used as staging area
Grand Street between 13th and 14th Street
No parking (24 hours, 7 days/week) on both sides of the street.
Road to be closed during working hours (8 am to 6 pm) and road open during non-working hours.
Grand Street: Roadway changed to 2-Way traffic (north and south) to allow access to resident garages/driveways.
Access to resident garages will be available during working hours and non-working hours.
16th Street between Jefferson Street and Adams Street
Section of roadway is open to two-way traffic (east and west)
No Parking (24 hours, 7 days per week) both sides of the street
16th Street between Adams Street and Grand Street
No Parking (24 hours, 7 days per week) both sides of the street
13th Street between Adams Street and Grand Street
No parking (24 hours, 7 days/week) signs will be placed on both sides of 13th Street between Adams Street and Clinton Street
Road to be closed 24 hours, 7 days/week; however, residents will be allowed access in from Grand St to 1300 Grant St garage. 1200 Grand St garage to be accessed via 12th Street.
Traffic detour: Grand St to 11 St to Adams Street
Access to 1300 Grand Street Building Garage: Residents to access the 13th Street garage from Adams Street with police assistance
We appreciate your patience and cooperation as we work to improve our infrastructure.