Madison Street Infrastructure Improvements: Construction and Traffic Management Activities May 19th - May 23rd

Madison Street Infrastructure Improvements

The Madison Street Area Infrastructure Improvements project will help mitigate localized flooding from rain events. The project scope includes replacing existing inlets, sewers, and water lines as well as elevating roadways, curbs, and sidewalks within the area. These improvements will alleviate the primary concerns by conveying stormwater into the sewer system.  

Work on the Madison Street Area Infrastructure Improvements will require parking restrictions, partial road closures, and 24-hour closure of Madison. Area residents will be kept apprised of the work and impacts on their quality of life.  

The following work and traffic management activities are anticipated for Monday, May 19th through Friday, May 23rd between the hours of 8 a.m. and 4 p.m.:

Work Activities:

  • Madison St between 10th and 11th Street 

    • Install the ADA Ramp and curbs in front of 1000 Jefferson coffee.

    • Install brick pavers at Madison St.

  •  Madison St between 9th and 10th Street 

    • Start Installing Helical Piles between 9th and 10th St.

    • Demo the existing road surface to install helical piles.

    • Maintain sewer bypass from STA 8+25 to Manhole 761, crossing intersection of 10th and Madison St. (Buried) 

Traffic Management:

  • Madison St full closure between 10th and 11th Street.

  • No-Parking on Madison St between 10th and 11th Street.

  • HPD will be on-site to assist with traffic management during construction.