Madison Street Infrastructure Improvements: Construction and Traffic Management Activities Week of August 18th
Madison Street Infrastructure Improvements
The Madison Street Area Infrastructure Improvements project will help mitigate localized flooding from rain events. The project scope includes replacing existing inlets, sewers, and water lines as well as elevating roadways, curbs, and sidewalks within the area. These improvements will alleviate the primary concerns by conveying stormwater into the sewer system.
Work on the Madison Street Area Infrastructure Improvements will require parking restrictions, partial road closures, and 24-hour closure of Madison. Area residents will be kept apprised of the work and impacts on their quality of life.
The following work and traffic management activities are anticipated for Monday, Aug 18th through Friday, Aug 22nd between the hours of 8 a.m. and 4 p.m.:
Work Activities:
Madison Street between 9th and 10th Street
Demo existing sidewalk.
Install the sewer lateral connections at Madison St for Shoprite.
9th Street between Madison and Monroe Street
Mobilize the material for water main installation work.
Demo existing road surface.
Start Installing water main.
Traffic Management:
9th St between Madison St and Monroe St will be closed.
Parking spaces will be available on East side of Madison St between 10th and 11th.
No-Parking on Madison St between 10th and 11th Street on West Side.
HPD will be on-site to assist with traffic management during construction.
We appreciate your patience and cooperation as we work to improve our infrastructure.